Design and implementation of a computerised hotel management system

Type: Project Materials | Format: Ms Word | Attribute: Documentation Only | Pages: 27 Pages | Chapters: 1-5 chapters | Price: ₦ 3,000.00

2,765 marked this research material reliable.
Call or whatsapp: +2347063298784 or email: info@allprojectmaterials.com
Design and implementation of a computerised hotel management system
ABSTRACT

 

This project is based computerized Hotel and management into gateway Hotel Ibara Abeokunta.

This now introduced system solve all the problems that are facing using the old system (manual system) and the objective of this new system are mentioned

Furthermore, the use of quick Basic programming language has also contributed to solving there problems. The language is very interesting once you are used to it, interactive with all it’s help menu, and flexible for amendments. The operator will find it amusing. It makes it easy for a non computer expert to operate on the new system.

This project limits the Hotels operation for registration of guest, reservation of rooms, billing guest which is also called Hotel bill and payment for calculating all employees salary throughout the company.

This new system design works in the same manner as the old procedure, but it does little and realistic different, it is accurate fast method I is more accurate. 


TABLE OF CONTENT

Title Page                                                                                                                   i

Certification                                                                                                              ii

Dedication                                                                                                                 iii

Acknowledgement                                                                                                   iv

Abstract                                                                                                                     v

Table of Content                                                                                                      vi-vii

 

CHAPTER ONE

1.0             Introduction                                                                                                  1

1.1       Project Management                                                                                    1-2

1.2       Rational for the Project                                                                               2

1.3       Aims and Objectives of the Project                                                           2-3

1.4       Scope and Coverage                                                                                                3

1.5       General Overview of Gateway Hotel, Abeokuta                                     3-4                                                                 

CHAPTER TWO

2.0             Literature Review                                                                                        5         

2.1       Lodging and Accommodation                                                                    5-6

2.2       Food and Beverage                                                                                      6         

2.3       Payroll                                                                                                             6

2.4       Reservation                                                                                                     6

2.5       Billing and Cashiering                                                                                    7

2.6       Storage                                                                                                            7

2.7       Production                                                                                                      7

2.8       Problems of Existing System                                                                          8

 

CHAPTER THREE

3.0             Analysis of the Existing System                                                                9         

3.1       Computer in a Hotel Ordering                                                                    9-11

3.2       Flowchart                                                                                                      12       

3.2.1   System Flowchart                                                                                         12

3.2.2   Program Flowchart                                                                                       12-13

3.4       Input Design                                                                                                  13-14

3.5       Input Output Control                                                                                   14

3.5.1   Master File Specification                                                                            14-15

3.6       Output Design                                                                                               15

3.7       Advantage of Automated System                                                              15

 

CHAPTER FOUR

4.0             System Design and Implementation                                                          16

4.1       Live Running                                                                                                            16-17

4.2       Limitation of the Implementation System                                                            17

4.3       Benefit of the New System                                                                         18

CHAPTER FIVE

5.0             Summary, Conclusion and Recommendation                                          19

5.1       Summary                                                                                                       19

5.2       Conclusion                                                                                                    19

5.3       Recommendations                                                                                       20                    References


 

CHAPTER ONE

 

1.0    INTRODUCTION

            In virtually any job whether it is clerical technical, business, or professional whether it is banking, manufacture, medicine, or retailing compare are useful tools with which to calculate, measure asses store, retrieve, regulate, monitor information, dry field of human endeavor is characterized by one a combination of these process.

            The impact of computer or organization and societies has been phenomenon. In recent years, on increasing number of researcher have processed various ways of incorporating the use of computer, in Hotel catering and management course.

 

1.1    PROJECT MANAGEMENT

            A project is a well defined effort to produce specific result at a specification. Project are always unique, be definition, an contrasted to normal on going departmental activities. Management is the art of purposeful direction. On the psychological sides, this involves both leadership and supervisor. Leadership involve helping other, reach goal oriented achievement by motivating people to adept common goals and work toward them. Supervisor on the other and involve helping other to avoid penalties for misdirected actions, those to avoid penalties for misdirected actions, those are contrary to the pursuit of accept organizational objectives.

            The four basic management function are to plan, organize, direct and control the work of others.

            Project management in different from the management of a functional department. Management techniques that have proven successful in other areas do apply the engineering of industrial computer system.

 

1.2    RATIONAL FOR THE PROJECT

            Computer is an electronic device that are humorously join together to accept data, process data, store data are outputting the resulting of the processed data in accordance to an internally stored programme.

            Computer are basically concerned with the processing of data into a meaning from. Today with the development of computer system, we are able to use computerized methods that not only described importance features of the data a but methods that allows into processed beyond the collected. Data into the area of decision making through generalization and prediction.

            In Nigeria today, nearly all the hotels want there activities to be computerized. Because of its efficiency and the effectiveness. 

            The efficiency impacts are mainly visible as reduction in transaction process cost, reflecting reduction in clerical cost, inventory cost and other current also.

Effectiveness impacts are visible in term of faster processing of throughout increased responses to ad how incurring increased accuracy the more complete converge of information that computer can accept, process, retain and provide.

 

1.3    AIMS AND OBJECTIVES OF THE PROJECT

            This project focuses mainly in computerized of Hotel catering management consequent upon numerous problem faced by manual  handling of hotel information here below are the main aims and objectives of introducing computers into hotel and catering management.

  1. To provide information that could not be obtained before
  2. To provide accurate data, when it is required
  3. To help to do jobs more efficiently
  4. To allow a wider range to task to be performed
  5. To present data in a more understandable way (e.g graphics/colour)

 

1.4    SCOPE AND COVERAGE

            This project is mainly on the application of computer to hotel catering and managers, staff do face in book keeping, searching, calculating updata, drawing and transferring of record or file from one department to another.

 

1.5    GENERAL OVERVIEW OF GATEWAY HOTEL, ABEOKUTA 

            The gateway, Hotel, Abeokuta is a home away from home in the respects situates on a wide expanse of land quite, free from Hubbub area of KUTO on the Muritala Muhammed Way. The hotel is ideal resort to recreate enjoy life in the fullest perspective.

            According to the general manager, Mr Bolaji N. Sonde and the public relation and marketing officer, Mr Adeolu Adebai, Gateway is a group of three hotel owned by the Ogun State government and was managed centrally until recently when each become autonomous with separate boards.

            At Gateway hotel, there are 200 rooms including suite and chalet and another annex located at the G.R.A containing 20 rooms.

            Other facilities include a car park, which can contain 1,500 cars an Olympic size swimming pool, conference room shopping plaza and four standard terms courts. One of the attraction of the gateway hotel is the animal pepper soup carnival in JANUARY where no top artists performed on the carnival group.

            Weekend are always busy at the hotel when guest, are treated to varying of entertainment and attended to by over 200 highly trained professional fort example, Porter waiter, keepers, chefs, doorman, linemen, lift man and receptionist to mention just a few.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


GATEWAY HOTEL ORGANIZATION STRUCTURE

Design and implementation of a computerised hotel management system

Additional Information

  • The Project Material is available for download.
  • The Research material is delivered within 15-30 Minutes.
  • The Material is complete from Preliminary Pages to References.
  • Well Researched and Approved for supervision.
  • Click the download button below to get the complete project material.

Frequently Asked Questions

In-order to give you the best service available online, we have compiled frequently asked questions (FAQ) from our clients so as to answer them and make your visit much more interesting.

We are proudly Nigerians, and we are well aware of fraudulent activities that has been ongoing in the internet. To make it well known to our customers, we are geniune and duely registered with the Corporate Affairs Commission of the republic of Nigeria. Remember, Fraudulent sites can NEVER post bank accounts or contact address which contains personal information. Free chapter One is always given on the site to prove to you that we have the material. If you are unable to view the free chapter 1 send an email to info@allprojectmaterials.com with the subject head "FREE CHAPTER 1' plus the topic. You will get a free chapter 1 within an hour. You can also check out what our happy clients have to say.


Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult one of our professional writers to help you with that. Depending on similarity of the organization/industry you may modify if you wish.


We have professional writers in various disciplines. If you have a fresh topic, just click Hire a Writer or click here to fill the form and one of our writers will contact you shortly.


Yes it is a complete research project. We ensure that our client receives complete project materials which includes chapters 1-5, full references, questionnaires/secondary data, etc.


Depending on how fast your request is acknowledged by us, you will get the complete project material withing 15-30 minutes. However, on a very good day you can still get it within 5 minutes!

What Clients Say

Our Researchers are happy, see what they are saying. Share your own experience with the world.
Be polite and honest, as we seek to expand our business and reach more people. Thank you.

A Research proposal for design and implementation of a computerised hotel management system:
Reviews: A Review on design and implementation of a computerised hotel management system, design, implementation, computerised project topics, researchcub.info, project topic, list of project topics, research project topics, journals, books, Academic writer.
This project is based computerized Hotel and management into gateway Hotel Ibara Abeokunta. This now introduced system solve all the problems that are facing using the old system (manual system) and the objective of this new system are mentioned Furthermore, the use of quick Basic programming language has also contributed to solving there problems. The language is very interesting once you are used to it, interactive with all it’s help menu, and flexible for amendments. The operator will find it amusing. It makes it easy for a non computer expert to operate on the new system. This project limits the Hotels operation for registration of guest, reservation of rooms, billing guest which is also called Hotel bill and payment for calculating all employees salary throughout the company. This new system design works in the same manner as the old procedure, but it does little and realistic different, it is accurate fast method I is more accurate... computer science project topics

Design and implementation of a computerised hotel management system

Project Information

  • CATEGORY : COMPUTER SCIENCE
  • TYPE : PROJECT MATERIAL
  • FORMAT : MICROSOFT WORD
  • ATTRIBUTE : Documentation Only
  • PAGES : 27 Pages
  • CHAPTERS : 1 - 5
  • PRICE : ₦ 3,000.00

Share Links

Download Post
Download Post

Search for Project Topics

Project topics in Departments

Do you need a writer for your academic work?