THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

Type: Project Materials | Format: Ms Word | Attribute: Documentation Only | Pages: 43 Pages | Chapters: 1-5 chapters | Price: ₦ 3,000.00

1,436 marked this research material reliable.
Call or whatsapp: +2347063298784 or email: info@allprojectmaterials.com
THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

CHAPTER ONE

INTRODUCTION

BACKGROPUND OF THE STUDY

The ultimate or core aim of an organization in this world today with the level of competition is to maximize profit and the satisfaction of consumers need through quality product irrespective of competitors and this can be achieved by quality control in an organization.

Quality is concerned with fitness or proper quality of product and it also goes with it price and delivery quality control takes this form of fitting standard quality, according to specification delivery and to schedule, the process through which the establish and need standard is commonly call “control series” this process consist of university accepted series of steps applied to problems quality to follows:

  1. Choosing the control subject that is selecting what is to be regulated.
  2. Selecting a standard values that is specifying the quality characteristics
  3. Creating sourcing services which can measure these characteristic in terms of unit of measure
  4. Interpretation the difference between actual and standard decision making and acting on the difference.

When the universal regulatory process as in the above is applied to problem of product quality.

It is often called “quality control” quality control have many definition such as.

Quality control is an attempt to identify and analyze weakness in product and decide on how best it is to decide with those problem or weakness so that the organization will grow.

Sometimes, the problem with a product is not that it fails to perform to specification but rather that it does not offer any significant advantage over competitors products already in the market.

Organization may have employees that are able and having appropriate equipment that leads to the increase in productivity yet sales falls below. Expectation the missing factors in many cases is the lack of effective quality control model in the organization.

A manager in any organization needs to have technical knowledge and competence about their product and best control model to be adopted and the best way of handling them effectively.

­

1.1    STATEMENT OF THE PROBLEM

Quality control cannot be ignored if meaningful goals and objectives are expected to be achieved.

Quality must be control as well as all other resources use in ensuring quality product. Currently Nigeria major problems in quality control is the use of outdated or inappropriate technology and lack of managerial experience is another problem facing quality control.

The success of our present day industries depends on how to manage our resources and to enhance growth and development for the success of industrialization to this end this research is preoccupied Peugeot automobile (Nig.) Kaduna.

1.2    BACKGROUND OF THE ORGANIZATION

The initiative to establish Peugeot automobile Nigeria limited was taken by the federal military government under the leadership of General Yakubu Gowon. The idea was concretized on October, 6, 1969 when the government invited 16 reputable vehicle manufacturing companies in the world to establish a vehicle assembly plant in the country.

Twelve years before the initiative was taken Peugeot cars make their first entry into Nigeria when individual imported about 100 units of the cars soon become popular due to their legendary reliability and suitability to Nigeria road conditions. The demand for Peugeot cars in Nigeria rose sharply again in the 1960s with the further introduction of the Peugeot 404 model with the high demand of Peugeot product which was a mark of acceptability. It was therefore, not surprising when in may 7, 1971, Automobile Peugeot of France proposal was selected out of those tendered by 16 various vehicle manufacturers.

Peugeot automobile Nigeria limited, PAN was incorporated in December 15, 1972 as limited liability company with an authorized share capital of three million Naira. Twenty seven months after incorporation, the head of state commissioned the assembly plant on march 14, 1975, and through full operations had commenced on march 2, 1975.

 

1.3    OBJECTIVE OF THE STUDY

  1. To look into the process of quality control in the manufacturing organization
  2. To find out the possible causes of low quality of the organizational product
  3. To know the systems of correction of quality defect of companies and suggestion and recommendation.
  4. To reduce over dependence on import in Peugeot Automobile Nigeria company.

 

1.4    SIGNIFICANCE OF THE STUDY

The significance of quality control in the production systems cannot be over emphasized more so, in a competitive environment such as Nigeria, it is imperative for firms to emphasis quality control to enjoy competitive leverages so that their product could competefavourably with the imported goods.

However, the attitudes of Nigeria manufacturing towards quality control are less encouraging. This is evidence in poor quality products. They do not make available to consumer or consumers it is then store of inverse importance to the manufacture  as the study has the overall objectives at attaining suggestion which they can effectively handle the challenges of quality control measure in their production activities.

1.5    RESEARCH QUESTIONS

  1. What are the processes of quality control in the manufacturing organization?
  2. What are the causes of low quality product in the organization?
  3. What are the system involved in correcting quality defect of the companies?
  4. In what way can over dependency on import be reduce in Peugeot Automobile Nigeria Limited?

1.6    SCOPE OF THE STUDY

Quality control management as chosen as a topic of relevant to the manufacturing industry in Nigeria.Although quality control management is an activity relevant to all business organization and employees of the manufacturing sectors. The research is restricted to the study of quality control management on organizational performance.

THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

Additional Information

  • The Project Material is available for download.
  • The Research material is delivered within 15-30 Minutes.
  • The Material is complete from Preliminary Pages to References.
  • Well Researched and Approved for supervision.
  • Click the download button below to get the complete project material.

Frequently Asked Questions

In-order to give you the best service available online, we have compiled frequently asked questions (FAQ) from our clients so as to answer them and make your visit much more interesting.

We are proudly Nigerians, and we are well aware of fraudulent activities that has been ongoing in the internet. To make it well known to our customers, we are geniune and duely registered with the Corporate Affairs Commission of the republic of Nigeria. Remember, Fraudulent sites can NEVER post bank accounts or contact address which contains personal information. Free chapter One is always given on the site to prove to you that we have the material. If you are unable to view the free chapter 1 send an email to info@allprojectmaterials.com with the subject head "FREE CHAPTER 1' plus the topic. You will get a free chapter 1 within an hour. You can also check out what our happy clients have to say.


Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult one of our professional writers to help you with that. Depending on similarity of the organization/industry you may modify if you wish.


We have professional writers in various disciplines. If you have a fresh topic, just click Hire a Writer or click here to fill the form and one of our writers will contact you shortly.


Yes it is a complete research project. We ensure that our client receives complete project materials which includes chapters 1-5, full references, questionnaires/secondary data, etc.


Depending on how fast your request is acknowledged by us, you will get the complete project material withing 15-30 minutes. However, on a very good day you can still get it within 5 minutes!

What Clients Say

Our Researchers are happy, see what they are saying. Share your own experience with the world.
Be polite and honest, as we seek to expand our business and reach more people. Thank you.

A Research proposal for the impact of quality control on organizational performance:
A Review on the impact of quality control on organizational performance, impact, quality, control project topics, researchcub.info, project topic, list of project topics, research project topics, journals, books, Academic writer.
The initiative to establish Peugeot automobile Nigeria limited was taken by the federal military government under the leadership of General Yakubu Gowon. The idea was concretized on October, 6, 1969 when the government invited 16 reputable vehicle manufacturing companies in the world to establish a vehicle assembly plant in the country. Twelve years before the initiative was taken Peugeot cars make their first entry into Nigeria when individual imported about 100 units of the cars soon become popular due to their legendary reliability and suitability to Nigeria road conditions. The demand for Peugeot cars in Nigeria rose sharply again in the 1960s with the further introduction of the Peugeot 404 model with the high demand of Peugeot product which was a mark of acceptability. It was therefore, not surprising when in may 7, 1971, Automobile Peugeot of France proposal was selected out of those tendered by 16 various vehicle manufacturers... production and operations mgt. project topics

THE IMPACT OF QUALITY CONTROL ON ORGANIZATIONAL PERFORMANCE

Project Information

  • CATEGORY : PRODUCTION AND OPERATIONS MGT.
  • TYPE : PROJECT MATERIAL
  • FORMAT : MICROSOFT WORD
  • ATTRIBUTE : Documentation Only
  • PAGES : 43 Pages
  • CHAPTERS : 1 - 5
  • PRICE : ₦ 3,000.00

Share Links

Download Post
Download Post

Search for Project Topics

Project topics in Departments

Do you need a writer for your academic work?