DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL


1,465 marked this research material reliable.
Call or whatsapp: +2347063298784 or email: info@allprojectmaterials.com
Department: petroleum engineering project topics | Type: Project topics and materials | Format: Ms Word, PDF | Attribute: Documentation Only | Pages: 50 Pages | Chapters: 1-5 chapters

DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL

PROJECT TOPICS AND MATERIALS ON DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL


ABSTRACT

Computer software is used extensively to increase productivity and reduce man’s hours of labour. This work presents the development of a solids control software (SOLCON) which is designed for real time mud system management and quick performance of routine rig computations: determination of total solids and low gravity solids content; mud property and density control requiring optimal ejection rate into the mixing pit; volume of mud and amount of barite, bentonite and additives to be added during the upgrading process of the mud. This software has the ability to evaluate the need for dilution depending on the maximum allowable drilled solids, viscosity and recommended total solids in the drilling fluid.

Finally, this software provides the atmosphere to control drilled solids as quickly as possible with all the necessary parameters.



CHAPTER ONE

FORMULATION OF THE PROBLEM

1.1        Introduction

Drilling fluid was introduced into the rotary drilling technology as means of transporting the drilled solids to the surface. Other function of the drilling fluids are controlling subsurface pressure, lubricating the drill string, cleaning the bottom of the hole, aiding in formation evaluation protecting formation productivity and aiding formation stability (Moore, 1986). One major function of the rig circulation system is the removal of drilled solids from the drilling mud before recirculation because of the adverse effects the drilled solids have on the drilling rate. One way of reducing drilling cost is the maximization of drilled solids removal from the drilling fluid (Field, 1972).

For sometimes now the industry has battled with various unsatisfactory solutions to the problem of solids control. These included the following:

1.            A piecemeal, temporary and very expensive way to reduce solids content is by discarding part of the system and rebuilding volume with added solids, water and chemical additives.

2.            The use of „inhibitors‟ such as lime and polymers to reduce the contribution of drilled solids to mud. Generally, these materials only delays the time when a mud must be discarded.

3.            A benefit more apparent than real way is the use „thinners‟. Thinners can reduce

the gel strength and the yield point of the mud (Nelson, 1970).

There are direct and indirect costs associated with drilled solids. The direct cost involves dilution and discarding of the excess volume of mud. The indirect cost is connected to the increase mud weight resulting from the presence of drilled solids in the drilling fluid. This may results in pressure differential between the drilling fluid and the formation fluid and hence reduction in rate of penetration. A reduction in hole cleaning ability as result of an increase in plastic viscosity may also lead to reduction in rate of penetration and generation of finer cuttings (Wells, 1976). Low rate of penetration increases rig time and in tend increase the cost of drilling. In order to maintain a low specific gravity of solids in the drilling fluid, about one- quarter of the volume of the drilling fluid containing the drilled solids is removed.

The three basic way to control the concentration of drilled solids in drilling fluids are; removal of solids, adding solids or their equivalent and treating solids chemically. Soluble solids and clay is added to increase yield point, gel strength, plastic viscosity and decrease filtration rate with minimum weight increase. To increase the density of the mud, barite is added with minimum effect on the mud properties and solid volume.

It is necessary to control the concentration of the drilled solids in the drilling fluid before returning it in to the drill pit. The more effectively the solids are mechanically removed the less dilution and hence the lesser the chemical treatment required (Moore, 1986).

DOWNLOAD COMPLETE WORK FOR DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL


Additional Information

  • The Project Material is available for download.
  • The Research material is delivered within 15-30 Minutes.
  • The Material is complete from Preliminary Pages to References.
  • Well Researched and Approved for supervision.
  • Click the download button below to get the complete project material.

Frequently Asked Questions

In-order to give you the best service available online, we have compiled frequently asked questions (FAQ) from our clients so as to answer them and make your visit much more interesting.

We are proudly Nigerians, and we are well aware of fraudulent activities that has been ongoing in the internet. To make it well known to our customers, we are geniune and duely registered with the Corporate Affairs Commission of the republic of Nigeria. Remember, Fraudulent sites can NEVER post bank accounts or contact address which contains personal information. Free chapter One is always given on the site to prove to you that we have the material. If you are unable to view the free chapter 1 send an email to info@researchcub.info with the subject head "FREE CHAPTER 1' plus the topic. You will get a free chapter 1 within an hour. You can also check out what our happy clients have to say.


Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult one of our professional writers to help you with that. Depending on similarity of the organization/industry you may modify if you wish.


We have professional writers in various disciplines. If you have a fresh topic, just click Hire a Writer or click here to fill the form and one of our writers will contact you shortly.


Yes it is a complete research project. We ensure that our client receives complete project materials which includes chapters 1-5, full references, questionnaires/secondary data, etc.


Depending on how fast your request is acknowledged by us, you will get the complete project material withing 15-30 minutes. However, on a very good day you can still get it within 5 minutes!

What Clients Say

Our Researchers are happy, see what they are saying. Share your own experience with the world.
Be polite and honest, as we seek to expand our business and reach more people. Thank you.

A Research proposal for development of a computer program for solids control :
Reviews: A Review on development of a computer program for solids control , development, computer, program project topics, researchcub.info, project topic, list of project topics, research project topics, journals, books, Academic writer.
Computer software is used extensively to increase productivity and reduce man’s hours of labour. This work presents the development of a solids control software (SOLCON) which is designed for real time mud system management and quick performance of routine rig computations: determination of total solids and low gravity solids content; mud property and density control requiring optimal ejection rate into the mixing pit; volume of mud and amount of barite, bentonite and additives to be added during the upgrading process of the mud. This software has the ability to evaluate the need for dilution depending on the maximum allowable drilled solids, viscosity and recommended total solids in the drilling fluid... petroleum engineering project topics

DEVELOPMENT OF A COMPUTER PROGRAM FOR SOLIDS CONTROL

Project Information

Share Links

Download Post (MsWord)
Download Post (PDF)

Search for Project Topics

Project topics in Departments

Do you need a writer for your academic work?