AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY


1,939 marked this research material reliable.
Call or whatsapp: +2347063298784 or email: info@allprojectmaterials.com
Department: marine engineering project topics | Type: Project topics and materials | Format: Ms Word, PDF | Attribute: Documentation Only | Pages: 40 Pages | Chapters: 1-5 chapters

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

PROJECT TOPICS AND MATERIALS ON AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY


CHAPTER ONE

INTRODUCTION

Many reservoirs are comprised of relatively young sediments, which are so poorly consolidated that sand will be produced along with the reservoir fluids unless the production rate is reduced significantly. Sand production leads to many numerous production problems including erosion of down hole tubular, valves, fitting and surface flow lines, collapsed casing because of lack of formation support. Thus a means to eliminate sand production without greatly limiting production rates is desirable.

Sand production can be controlled using different methods but the method of utmost importance to this project is the mechanical method which basically involves the use of gravel pack (GRAVEL PACKING).

This method is considered the oldest and most effective sand   control mechanism. It is simply a down hole filter designed to prevent the production of unwanted sands which involves the placement of gravel across a perforated interval in the sand screen annulus and also in the perforation tunnel to prevent the influx of sand.

Inaccurate determination of gravel pack size, could lead to sand influx which could be detrimental to both the technical and economic aspect of production which is the overall objective of this project aimed at identifying means to selectively select appropriate gravel pack sizes from formation sands produced through sieve analysis to meet optimum sand control for maximum production without any detrimental effect to production hard wares.

In a gravel pack completion, sand that is larger than the average formation sand grain is placed between the formation and a screen or slotted liner with the aim of retaining most of the formation sand, but letting  very fine particles through it and be produced.

The two most common types of gravel pack completion are the inside casing gravel packing or internal gravel packing (IGP) and underreamed gravel pack or external gravel pack (EGP). The underreamed casing gravel pack provides better conductivity through the gravel but is limited to single zone completion.

 

1.1 AIMS AND OBJECTIVES

This project is aimed at

  1. To study   the various types of gravel packing methods  used in  the petroleum industry.
  2. To analyze sieve analysis data of formation sands gotten from OBEN13L in other to determine the appropriate gravel pack size used.
  3. To make conclusions on the state of OBEN WELL 13L on the basis of sieve data analysis and give possible recommendations.

 

1.2 SCOPE AND LIMITATION

The scope of this project is limited to the mechanical method  of sand control with more emphasis on the sieve analysis of formation sands gotten from OBEN13L.

 

 

1.3 METHODOLOGY

The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used  for OBEN WELL 13 with formation sands gotten  from  the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples  and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using  sucier correlation.

DOWNLOAD COMPLETE WORK FOR AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY


Additional Information

  • The Project Material is available for download.
  • The Research material is delivered within 15-30 Minutes.
  • The Material is complete from Preliminary Pages to References.
  • Well Researched and Approved for supervision.
  • Click the download button below to get the complete project material.

Frequently Asked Questions

In-order to give you the best service available online, we have compiled frequently asked questions (FAQ) from our clients so as to answer them and make your visit much more interesting.

We are proudly Nigerians, and we are well aware of fraudulent activities that has been ongoing in the internet. To make it well known to our customers, we are geniune and duely registered with the Corporate Affairs Commission of the republic of Nigeria. Remember, Fraudulent sites can NEVER post bank accounts or contact address which contains personal information. Free chapter One is always given on the site to prove to you that we have the material. If you are unable to view the free chapter 1 send an email to info@researchcub.info with the subject head "FREE CHAPTER 1' plus the topic. You will get a free chapter 1 within an hour. You can also check out what our happy clients have to say.


Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult one of our professional writers to help you with that. Depending on similarity of the organization/industry you may modify if you wish.


We have professional writers in various disciplines. If you have a fresh topic, just click Hire a Writer or click here to fill the form and one of our writers will contact you shortly.


Yes it is a complete research project. We ensure that our client receives complete project materials which includes chapters 1-5, full references, questionnaires/secondary data, etc.


Depending on how fast your request is acknowledged by us, you will get the complete project material withing 15-30 minutes. However, on a very good day you can still get it within 5 minutes!

What Clients Say

Our Researchers are happy, see what they are saying. Share your own experience with the world.
Be polite and honest, as we seek to expand our business and reach more people. Thank you.

A Research proposal for an assessment of gravel packing methods used in the petroleum industry:
Reviews: A Review on an assessment of gravel packing methods used in the petroleum industry, assessment, gravel, packing project topics, researchcub.info, project topic, list of project topics, research project topics, journals, books, Academic writer.
The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used for OBEN WELL 13 with formation sands gotten from the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using sucier correlation... marine engineering project topics

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

Project Information

Share Links

Download Post (MsWord)
Download Post (PDF)

Search for Project Topics

Project topics in Departments

Do you need a writer for your academic work?